I seem to be missing a checkbox when converting a line of text into a story from confluence. I want to add actions/stories in the correct epics, but the checkbox "add under epic" is missing. THe page is linked to the epic. Did I miss something?
In jpg a screenshot with the selected text which needs to be converted into a story.
The only options are to enter the project, issue type, summary and description. The epic has to be linked later.