Actually, balanced workload works on number of issue assigned.
Is there a way to assign issue calculating the sum of time estimated for user?
Example:
user1 has 5 issues assigned with a total of time estimated = 300m
user2 has 3 issues assigned with a total of time estimated = 400m.
The balanced workload automation will assign a new ticket to user2 because has less issue then user1, but he has more time estimated.
I 'd like to assign a new ticket to user1 because he has less time estimated.
Is it possible?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.