Hello,
When I try to complete my sprint, all the story are considered as open which is not the case.
So it proposed to move the story to an other sprint.
All of them have a done status.
I though maybe it was because of the open status of the epic linked but even if it is done as well the result is the same.
Do you have any idea on what is the problem here?
Thank you in advance.
Regards,
Caroline
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.