Correct way to log work

Joao Vitorino He/Him February 8, 2022

My team used to estimate the task in minutes, when we log work time, we use the `Time spent` option- in red on the picture.

When we spent less than what was estimated, what is the correct way to log the work before moving the ticket to the done column?
Example:
Estimate: 45m, Spent: 15m 
This leave 30 unused minutes.

Option 1: 
Just change the time spent field to 15m and move the ticket to done.

Option 2:
Must fill the 'Time spent' field with 15m and fill the 'Time remaining' field with 0m (yellow in the image).

There are differences between these 2 options? What is the correct/best way?


Time spent.PNG

 

0 answers

Suggest an answer

Log in or Sign up to answer