How to delete committed Story points from a Sprint when added by mistake

Ana Rosa Costa
I'm New Here
I'm New Here
Those new to the Atlassian Community have posted less than three times. Give them a warm welcome!
January 31, 2019

Hi,

By mistake i added the wrong story to sprint scope and pressed Start Sprint.

The story points from that user story were added to the total of Committed Story points.

How can i remove the story points from that user story so Committed Story points are correct?

1 answer

0 votes
Troy Spetz
Contributor
February 1, 2019

Remove the issue from the sprint.

 

This will reduce the sprint's total points by the number of points which were assigned to the (now removed) issue.

Ana Rosa Costa
I'm New Here
I'm New Here
Those new to the Atlassian Community have posted less than three times. Give them a warm welcome!
February 1, 2019

Hi,

i removed the issue from the sprint. on Jira story points are correct, it doesn't take in consideration the number of story points, but when i create the velocity chart, on eazybi, the total value of the committed story points is adding those story points.

Ex: in Jira total of story points is 279SPs, after issue being removed

in eazybi total committed story points is 311SPs.

 

When i drill across the value it is displaying the user story that was removed from the sprint.

For velocity chart to be correct, committed story points should not be taking in consideration the story points from the user story removed.

How can i have the correct value?

Thank you