I want to create stories for a project with story points. Then create tasks inside the story with estimated time. Currently I can do what I want using log work. But I have to log 1h and set remaining time. I want to avoid it and set estimate time at task creation.
Hi Heshawa
I think your task screen do not have "Timetracking" fields included.. Add that in the screens to see the 'original estimate' in the tasks
Thanks and regards,
Fazila
Hi Fazila,
How do i include Timetracking fields? Is it in project properties? What kind of permission I need to make this change? It would be very helpful if you can guide me how to reach the view to include Timetracking.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
@Heshawa De Silva , Are you the jira-administrator of your jira instance?
The jira-administrator will be able to modify the screen design via screen schemes and add the field 'time tracking' to the screen used by your task issue type.