JEMH - Using directives to transition items

Adriana Cavazos October 10, 2018

Hello,

I'm using the JEMH plugin and I'm trying to use links in an email to transition the items on a specific flow.  I was trying to set up the directive as shown in: https://thepluginpeople.atlassian.net/wiki/spaces/JEMH/pages/114982925/Use+Directive+Sets

However, unlike in the example, I don't want this action to be executed (the email sent) on an Issue Created Event, but on a specific transition event.  For Instance:

Issue Created > Step1 > Step2 > Step3: Complete/Cancel> Done

Whan an item moves to step 3, I want a specific email address coming from a custom field receives an email with two links to either complete or cancel the task.

I have two directives configured, each one with a different transition

- @workflow=Completed

- @workflow=Canceled

How do I add the event listener for the item moving from Step 2 to 3?

 

Thanks,

Adriana.

1 answer

1 accepted

1 vote
Answer accepted
Deleted user October 11, 2018

Hi Adriana,

Reece from The Plugin People here, I can see you have raised a question via our Confluence Questions system, one of the team will follow up via that question shortly.

Kind Regards,

Reece