I'm currently managing a project which includes issues from two epics across different projects.
There are several things not adding up:
My whole goal is to be able to see the Epic Burndown chart. What am I doing wrong?
Hello @Kim Killen
2. The two Epics are not shown in the Backlog because you did not include them in your filter.
Your filter: ("Epic Link" = "idsv8-1059" OR "Epic Link" = "esdr-1")
The filter you need: "Epic Link" = "idsv8-1059" OR "Epic Link" = "esdr-1" or issue in (IDSV8-1059, ESDR-1)
3. We don't see filenames or labels for the images you added so I'm not sure which images you're referring to but I think you mean:
"backlog2" pic
"active sprints" pic
"columns" pic
What you have circled in Backlog 2 is not the count of issues. That summary is based on what you have set for Estimation, which you stated was Story points. The gray bubble is the sum of the Estimates field you selected for all issues in the left most column of the board for the specified sprint. The green bubble is the sum the Estimates field you selected for all the issues in the right most column of the board for the specified sprint. The blue bubble is the sum for all the issues in the columns between the left most and right most column. Based on the images, the bubble s are showing the correct values.
And your last question about seeing the Epic Burndown charts for the two Epics will be solved when you update your board filter to include the two Epics.
Online forums and learning are now in one easy-to-use experience.
By continuing, you accept the updated Community Terms of Use and acknowledge the Privacy Policy. Your public name, photo, and achievements may be publicly visible and available in search engines.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.