I am a Project Manager. I got into the current project when it was already started.
When I change the issue status Jira automatically logs an additional 30 minutes of work to that issue. Probably the previous PM needed it but I want to remove this automatic logging. How can I do it?
I'm assuming there may be a post function which was triggered when you transitioned the issue from one status to another.
please contact jira-administrator and ask them to remove the post function if not required.
Thanks
Rahul
@rahuldanwade
Thank you for your answer!
I have jira-administrator rights. I've checked post-functions and removed some of those that were adding 30 minutes logging. But I still have this problem with the transition "Opened -> Acknowledged". There are no post-functions with 30 minutes logging in there but it works like it's there.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.