Hello there Everyone,
I'm looking for a way to follow a sprint's evolution and progress is "Story points" while having the data for every assignee in that spring, something similar to the picture attached.
Thanks in advance.
I can see the sprint summary in the backlog,
Is there a way to change the "Remaining Time Estimate" in story points too? That would do it.
Thanks.