How to set up JIRA for 2 teams on the same backlog so that the JIRA-Reports work correctly?

Joachim Schittenhelm February 27, 2018

How do we have to setup JIRA that all the reports work properly when working with multiple teams on one backlog?

Our current setup:

  • parallel sprints enabled
  • 2 "Backlog-Sprints" labeled "Backlog Team A" and "Backlog Team B"
  • 2 active Sprint like "Team A - Sprint 100" and "Team B - Sprint 100"

where Team A works on Epic A and Release A and Team B works on Epic B and Release B.

 

The problem is, that reports like the Release Burndown do not work properly as the Sprints on Team B (that work on Epic/Release B) are shown when looking at the Release Burndown of Release A.

 

Our first idea is to create Boards that just contain the Sprints of Team A (or Team B). But it's not possible to filter the name of the sprint with "~". Therefore we would have to alter the filter of the board with every new sprint (Team A - Sprint 101, Team A - Sprint 102,...).

 

Is there a better possibility to solve our problem?

7 answers

1 vote
Vinh Bao March 16, 2018

Looks like I have the same issue shown incorrectly in Epic Burndown when multiple teams working on

Steps to Reproduce

Create a project call TEST
Create a custom field (text field) call Team.
Create two filters:
Team A: JQL: project = TEST and Team = Seal
Team B: JQL: project = TEST and Team = Sparta
Assign Team Seal value to TEST-1
Assign Team Sparta value to TEST-2
Create two issues TEST-1 and TEST-2
Create two board Team Seal and Team Sparta and use the Team Seal and Sparta filters
Create a board by including Team Seal and Team Sparta with the JQL query (project = TEST)
Create an Epic call Team Redshift and link TEST-1 and TEST-2 together.
Add a sprint for Team Seal and Sparta board with different name. and same duration, Start Date, End Date
Set a story point to TEST-1 and TEST-2
Transit TEST-1 and TEST-2 to Done.
Ended the two Sprint and view the Epic Burndown chart

Expected Results

  • Seal Sprint 2 and Sparta Sprint 2 should merge together as the same duration, Start Date, End Date
  • Seal Sprint 3 and Sparta Sprint 3 should merge together as they have the same duration, Start Date, End Date

  •  Velocity forecast should based on average velocity of last 3 sprints by time and having story points eat up.

Actual Results

  • Seal Sprint 2 and Sparta Sprint 2 don't merge together although they they have the same duration, Start Date, End Date
  • Seal Sprint 3 and Sparta Sprint 3 don't merge together although they have the same duration, Start Date, End Date

  •  Velocity forecast isn't correct, it based on average velocity of last 3 sprints by order

     Capture.PNG

0 votes
willw-bhp
I'm New Here
I'm New Here
Those new to the Atlassian Community have posted less than three times. Give them a warm welcome!
April 1, 2019

Was hoping someone might have found solutions or to learn Atlassian have made an enhancement to fix. This has been a long standing issues and I suspect it force some people to split JIRA projects, which in itself cause much worse problems when trying to run a mature Scaled Scrum set up with a single PO and limited local optimisation.

JIRA portfolio has the notion of teams but JIRA itself does not. Adding this feature might be one way to solve it.

I have raised it as a suggested enhancement

https://jira.atlassian.com/browse/JRACLOUD-71828

0 votes
Joachim Schittenhelm March 2, 2018

as far as I see, this is a bug...

0 votes
Joachim Schittenhelm March 1, 2018

@Peter DeWitt This does not work properly either.

We already got a different release for each team as they are working on different features. (completely different, nothing in common)

But when I open this report ALL the sprints of both teams are listed and somehow count towards the release. It seems quite stupid, but I do not get my mistake (or JIRA's mistake).

Peter DeWitt
Community Champion
March 1, 2018

Hmmm. Let me test it out here and I'll let you know.

Joachim Schittenhelm March 1, 2018

@Peter DeWitt thanks a lot

as far as I see JIRA mixes up the assignment of issues to sprints!

Team Orange (with all their MP <number> Orange - Sprints) does not at all work on this release!

image.png

0 votes
Peter DeWitt
Community Champion
March 1, 2018

@Joachim Schittenhelm, Sorry for the mis-understanding.  That report is not going to key off of the sprints (they wont matter).  What you will need to do is create a separate release for each team (sprint).  For example, Release #1 - Team A & Realease #1 - Team B.  This will let you essentially view each sprints work on this report.  Not a perfect solution but the best Jira can do.

 

pjd

0 votes
Joachim Schittenhelm March 1, 2018

@Peter DeWitt I meant a different report. The regular burndown chart works perfectly fine.

But the Release Burndown does not (with our setup). 

I meant this report:

image.png

0 votes
Peter DeWitt
Community Champion
February 27, 2018

@Joachim Schittenhelm, you should be able to specify what sprint you are looking at in the burndown report.  We have 3 teams using a single project with 3 different sprints. The dropdown below should show you your current sprints as well as any past sprints.

 