Forums

Articles
Create
cancel
Showing results for 
Search instead for 
Did you mean: 

Jira Structures for change request

mummareddy supriya
Contributor
March 27, 2025

I need to fetch the linked issues for the change request and the linked issues with linked issues. For example, I'm having a change request linked to an epic, and that epic is linked to work packages with a link type that is related to up to here I'm able to retrieve it. But Epic is having issuesinEpic it possible to fetch it ? is it possible to role up the timespent to parent ticket in structures ?.issues in epic.PNG

Any one knows the solution please help me here and thanks in advance  

1 answer

0 votes
Dmitry Astapkovich _Colined_
Atlassian Partner
March 27, 2025

Hi, 

Unfortunately, this is not achievable out of the box. Jira allows you to query linked issues, but you can't nest queries to get linked issues of linked issues. This is one of the reasons why we've created Pivot Report: get a full picture of your custom hierarchy with rolled up values for any fields and time entries:

SCR-20250328-lggx.png

You can check this demo report here. 

Additionally it's possible to get time report based on worklogs. So it won't be just a total time spent, but rather a roll up of time entries from a specific period of time:

SCR-20250328-lhdo.png


Suggest an answer

Log in or Sign up to answer