Hi,
Is there a possibility to require the task to be Originally estimated before first work log.
I mean, I do not want to have logged work on tasks, which do not have any estimations.
Thanks.
Have you tried logging work in Tempo on issues with no original estimates? It sets the orginal estimate to time spent + remaining estimate.
Well he has to think about the estimation. That is what he enters in the remaining. He sees that there was no estimation set and has to think about it :)
Would you like him to enter the original estimation at the same time? He would them enter what he spent + what he thinks is remaining as original estimate. Which is what Tempo does automatically.
Is that not the ideal solution?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Not that I know of.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You can configure the Time Tracking field to be Required in the Field Configuration Scheme. That way, each successful new issue creation must have the Original Estimate set.
Hope this helps.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
It does not help me, as a new created issue, in our case, should not immediately have the estimations. This is because there are lots of cases when we create issues, put them in backlog and only the person that begins working on that issue, or logs the work on it, should estimate it.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Oleg,
If that is the case, you might want to take a look at some of these other Answers posts that talks about making a field required based on another field :
https://answers.atlassian.com/questions/54234/how-to-show-and-hide-specific-customfields-based-on-another-customfield-values
https://answers.atlassian.com/questions/70973/how-do-i-make-a-field-required-based-upon-the-value-of-another-field-set-in-workflow-transition-screen
These methods might require a bit of work, though, as certain plugins are required to achieve this.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I can't understand how your solution might help me? I just need to be able to verify if Original Estimation exists before first work log.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Oleg,
I figured that it could help in your situation by making the Work Logging field dependent on the Original Estimate field. This way, the Work Logging field would only be available for edit once the Original Estimate field is filled.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Online forums and learning are now in one easy-to-use experience.
By continuing, you accept the updated Community Terms of Use and acknowledge the Privacy Policy. Your public name, photo, and achievements may be publicly visible and available in search engines.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.