Hi all,
I have 2 stories S1 and S2 of 2 distinct story types Each has its own statuses and its own workflow because each has its own process. however, S1 and S2 are linked to the same epic (same parent).
I need to implement a synchronisation between S1 and 2 because, a status transition on S1 is condition for a transition on S2. The sole common thing between both stories is their link to the same parent. My current problem problem is to synch sister issues. If S1 does not exist, S2 has no sister and processing S2 does not rely on any other story.
I have read so far conditions can be for all child subtasks for an issue but nothing about sister issues. I explored creating a single workflow combining S1 and S2. But there again, S1 can have a life of its own. Same thing for S2. But if both exist with the same parent, synch is needed.
Any help is warmly welcomed. Thanks.
Hi,
If you have JMWE, you can do it using the "Transition Related Issues" post-function.
Regards,
Radhika
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi @Jean-François RIOU ,
Do you have Automation For Jira or ScriptRunner? It could probably be done with one of those, but I do not use ScirptRunner so I could not offer any advice there.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Online forums and learning are now in one easy-to-use experience.
By continuing, you accept the updated Community Terms of Use and acknowledge the Privacy Policy. Your public name, photo, and achievements may be publicly visible and available in search engines.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.