We just installed the Capacity Tracker & I am attempting to configure it to our liking. I am struggling to determine how the tracker calculates the total number of Story Points for the team.
For example, if I have 5 members with a daily capacity of 4 story points/day each & our sprints are 2 weeks M-F (10 days total), the tracker says the team total capacity is 140 story points.
Can you tell me how the tracker came to that number?
Thank you
Christine