Dear Friends,
I would like to know, is there a posibility to take backup of JIRA Software without project data.
My Test Case :
I have JIRA Software 7.1.9 Production. I can take backup of JIRA software with data (Scheduled). The server is powerful enough to handle with SQL Data.
For testing additional add-on and I am using Developer License. Test machine is a regular PC. With huge/large SQL data, system is not able to load fast as Test JIRA Software is configured to use default database(HSQL).
If I am able to restore the existing setup to new test setup without projects data , system will load fast and I can create projects whatever is required.
Is there a way to achieve this?
Thanks and Regards,
Sivarama Krishna K
Thank you.
You'll need to use one of the Apps that extracts and transfers the project/system configuration only.
The two I've used are Botron's Configuration Manager and Adaptavist's Project Configurator (as you'd expect, as I work for Adaptavist)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Online forums and learning are now in one easy-to-use experience.
By continuing, you accept the updated Community Terms of Use and acknowledge the Privacy Policy. Your public name, photo, and achievements may be publicly visible and available in search engines.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.