on a scrum board I am able to see time tracking on the right hand side which has components
But for another issue, I am not able to see this option.
Both belong to the same board and both are user stories.
I have configured the board for time traciking and time tracking is on in the issues part.
Am i doing something wrong?
Thanks,
chetan
Has the issue with the missing time info actually got an estimate and/or work logs?