I need to have the total(time aggregation) in terms of time (or story points) per column in Work Mode in JIRA Agile. Is this possible?
We have enabled tracking by original time estimate, enabled time tracking and tickets have time estimates. We are using Jira OnDemand
I'd like to do the same thing, getting reports on estimated time per ticket status / swim lane. Is there any way to do this out of the box? Or with a plugin?