For Plans I can set a Sprint Capacity and a Team Capacity, is it either/or when determine capacity or how is it designed that these capacities influence each other?
Hi @Adam Bang
You can set Sprint Length and Capacity
Sprint Length should be equal to the sprint length used when creating a sprint in a scrum project.
Capacity is the total of average completed number of Story Points by a Team when executing a sprint.
So historically you can check your average story points completion number per sprint and set this the capacity of the team.