Hi All, JIRA is new to me and I am not able to figure out this things. I'll elaborate by one example:
The 2nd point Tickets can't be dragged like point 1.
Although, If there is:
T-1 , T-2 , (T-3 subtask TO T-4(closed)) ===> T-1 and T-2 can be swapped with T-3
That sounds like you have conditions on the workflow that say "do not allow the moving of issues if linked fields are <some rule>"
Could you open up the workflow and look at all the conditions on the transitions?