i have two Tasks.
Task1 Blocks Task2 thus Task2 is blocked by Task1.
Nevertheless it is possible to open Task2 or set done task2 in front of task1.
I will that Task2 cant't be opend befor Task1 moved to "Done".
How can i configure this in Jira?
Thanks in Advance, sincerly Frank
P.s.: Jira v7.13.2 on Server