linking fields from other projects

MARY USEN
Contributor
February 19, 2025

is there a programmatic way to pull a custom field (Target End Date) from one project's ticket into another ticket

For example: I'm on project X and in my ticket i reference that ticket 1 from Project Y is the List needed.

Can i programmatically add a formula into the Acceptance Criteria of my ticket that searches for what is populated in the custom field (in this case Target End Date), so that i can see that target end date populated in my acceptance criteria?

I saw the inline view of the link only shows key, summary and status. can a custom field be pulled in there if the above is not possible?

Currently i am manually drilling into the List Build ticket to find the target end date and than manually entering that date into my ticket
JIra SS 1.jpg

1 answer

0 votes
Manoj Gangwar
Community Champion
February 19, 2025

Hi @MARY USEN You can achieve this by creating an automation rule if project A & B issues are linked with each other.

If they are linked then see the below thread- https://community.atlassian.com/t5/Jira-questions/Copy-custom-field-value-from-project-A-to-linked-epic-in-project/qaq-p/2805146

 