I am trying out WBS Gantt-Chart to import a schedule from MS Project.
It looks great so far, but when I go to import there is no option to select the issue type to be imported to be an Epic. Is there a way to do this?
Additionally, when I import the tasks each task has a number like 2.24 or 2.24.1 etc. in front of the name. Is there a way to avoid this?