Hey community,
I'm using the Jira power bi connector to extract the tempo timesheet in the power bi report, however, the team sometimes logs their own time on sub-task instead of logging it on task or epic level, is there a way to roll up all the spending time on sub-task to the task or epic level?
thanks in advance