Has anyone successfully used the Ceptah Bridge - JIRA MS Project Plugin on Data Center?
Hi All, We are in the intention of making a decision of using any of the these plugins (Ceptah Bridge and The Connector) in which to integrate MS project with JIRA , the crucial point we depended on...
Hello, I have a Parent task with issuetype X and subtasks with issue type Y. In parent and subtaks I have plan start and plan end datepicker CF types (specific for the each issue type, i.e., Planned...
I'm trying to plan tasks in MS Project and bring the data over to JIRA and Tempo (having updates go both ways would be ideal). I've installed a trial version of Cetaph Bridge to synchronise between ...
Have a scenario that my client wishes to explore solutions for. An export to MS Project would be ideal, but the use-case is mapping utilisation of assets (not people). Would therefore need to be able...
Hello, We would like to evaluate this plugin in JIRA softawre 7.2.1. Could you send us a free license for a while please ? Thx
I was able to install, run and connect to JIRA on my old laptop running Windows 7. After moving to a new laptop running Windows 10 I am able to install the Ceptah Bridge but I cannot see it as an ad...
HI I am looking at improving the way that we do thing on the PM front - we are already using JIRA and confluence, and am looking at what else we can utilise and lay over the top, from a...
Have MS Project-Ceptah cannot connect from MS Project. Does this need to be enabled on JIRA in order for it to work? If so what needs to be done.
After using this workflow for about a week, it has broken. my workflow: Import from JIRA into blank project, using saved import settings to capture all relevant data adjust project schedul...
Hello, My setup : Windows 7 Microsoft Project 2013/ceptah bridge JIRA Cloud (For projects issues tracking) I have a error message when I want to synchronize on ms project "the remot...
Hi, How can I make localization for Ceptah Bridge? Is it possible?
Hello, I wanted to compare two fields (out of JIRA and MS Project). The one field is that "commerical launch date (plan)" in JIRA and the other field is "actual start" in MS Project. Problem is, th...
Would like to trial the MS Project integration but we were recently upgraded to JIRA 6.3.10. Is the MS Project integration tool from CEPTAH compatible with 6.3.10, if not when is this like...
I am trying to evaluate the Ceptah Bridge tool for MS Project and JIRA. However, upon trying to create the connection to JIRA, I receive a error, "The remote server returned an error: (401) Una...
Hello, I am very interested in evaluation the Ceptah Bridge add-on but I can't purchase it without evaluating it first. Is there a potential for trying it first?
Hi I am a Program Manager at Adobe and evaluating the Ceptah Bridge to work with JIRA and MS Project. I am wondering if there is any way I can map a parent issue type to an Epic using Ceptah Brid...
On the description of the add-on, it says it is available on Cloud, but it is not available on the market place through the UPM.
Hi We have a use-case where in our PMs want to import data from MS Project into JIRA. The requirement is only to move it once and in one-direction i.e. from MSP to JIRA. Once the data is in JIRA it...
We've set up JIRA tickets as a parent task with subtasks underneath it. The parent task has no time allocated to it. When I sync with MS Project, it shows an accumulation of the subtasks but also see...
Copied to clipboard