My projects use Portfolio Themes to align Initiatives to the Themes. Epics roll-up to Initiatives, Stories roll-up to Epics, etc. We estimate in Story Points and do not capture work hours...
Hi! I have been reviewing Portfolio for JIRA for some time and all times I have run in to a problem I have found a solution, almost always caused by myself. However since a few days something...
When I'm manually assigning a member in portfolio to a ticket, how can I stop it auto-assigning the tickets related to it to the same person, even if there is someone already allocated? e.g. task mem...
I have multiple areas of work that I want to do each sprint. The Themes model works well here; I have assigned a Theme to all my stories and I can check how much of each Theme I'm working on each spr...
We're a game development team, and our skills are largely exclusive, like "Design", "Engineering", "Art". Each team member has only one of those skils. Most of my stories require at least one of thos...
I want to create a roadmap that facilitates capacity planning that looks/achieves something like the below: I've seen plugins that might help like Aha and Portfolio but I'm not sure if I would be ...
Hello, I'm using one of the new scriptrunner canned scripts, called 'Show Parent Issue in Hierarchy'. My goal is to have a field that shows the Initiative that a story relates to. Our Portfolio hie...
On top of the standard notifications JIRA offers, does Portfolio offer any additional notifications? We were wondering if we can have Portfolio users notified in case the underlying content of a plan...
I understand there currently is a limit for loading 5,000 issues into a portfolio plan. Also saw that a corresponding feature request for increasing this limit has already been created (https://jira....
Currently I am working within a JIRA instance that has many projects with many versions (think of a lot of minor versions like "1.0.1", "1.0.2", "1.1.0", "1.1.1" etc). This is resulting in a Portfoli...
So when a project kicks off we know that we dont know all the stories, how does Jira porfolio account for that? we are just about to start using it but I dont know how I will be able to estimate end ...
The latest release of Portfolio for Jira on server doesn't appear to offer quite the same feature set as the cloud version. Is there a feature comparison matrix or document comparing the two of them ...
I have created a plan in JIRA portfolio. Post plan creation, I have added stories and estimates... as well as burned down other stories. I am looking for a way to update this in Portfolio
We are looking to add Themes to our Portfolio plans. Currently when you add Epics to Themes, the dates on the Themes "adjust" based on the dates in the Epics. We would like to know if the following s...
In portofolio under 'scope' one can see the issues that belong to your selected release. On the bottom I see a list with the issues I've added in Jira to this version (in the issue 'fix version' = r...
I must be missing something obvious but I can't see how to add existing Jira Epics to an already created Plan. (When I created the Plan I was getting server timeouts. The only way around ...
When setting up a new portfolio plan over 4 different teams (projects), I've created a new cross-project release and added some epics for each team which are needed for this release. Now, the teams c...
Hi, I was wondering if it was possible to get the stories on the schedule view to be more accurately represented based on the estimate. We currently use an hourly estimate for each story in the sche...
I want to add an additional board/project in Scenario b of my portfolio planning. How can I do that? Reason: I want to separate specific projekt workload from Feature requests and want to show the im...
Hello, We have frontend and backend developers, as well as frontend designers, we create separate tasks for frontend, backend and frontend designers, as they take different amount of time depending ...
One of the teams I am working with has a stable velocity, but will be having a specialist join the team for a few Sprints to address some specific (related) work. The team want to show increased cap...
We are currently using JIRA Portfolio and have dependencies defined in JIRA as Requires and Required by. The configuration of Portfolio has this dependency type specified. Within Portfolio, dependen...
I've got an existing set of ~15 projects which I've reflected in a custom hierarchy (see below). I've ~30 issues at the Initiative level and many more at the Feature level. ...
Hi I'm playing around with Portfolio for Jira for a couple of days and I have a question about showing/tracking progress of epics/stories/sub-tasks. I can see a progress of tasks in Progress column...
I just installed the new trial server version of Jira (7.5) and installed the new version of Portfolio (2.6) and I get this error message. Version:1.0 StartHTML:000000212 EndHTML:000025289 S...